Extensive renovation of this three-story 60,000sf hotel included demolition, exterior stucco replacement, waterproofing, framing, structural steel, drywall, HVAC, electrical, fire alarm system and sprinklers upgrade, ADA lift, roofing, windows, remodel of interior suites, lobby, bathrooms and corridors including doors, paint, wallpaper and tile, as well as, pool, concrete and landscaping. |